Uploaded image for project: '[Read Only] - Hippo Repository'
  1. [Read Only] - Hippo Repository
  2. REPO-571

Implement lock keepalive for long running jobs

    XMLWordPrintable

Details

    • New Feature
    • Status: Closed
    • Normal
    • Resolution: Fixed
    • None
    • 2.24.02
    • None
    • None

    Description

      With the new bulk workflow operations scheduled jobs may take a lot longer to execute. Currently the quartz-based repository scheduler takes a lock with a timeout of 2 minutes on the job node. After that, either the job is assumed to be either finished and rescheduled or finished and removed. For bulk workflow jobs this assumption may is no longer reasonable.

      Attachments

        Activity

          People

            fvlankvelt Frank van Lankvelt (Inactive)
            uhommes Unico Hommes (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            0 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: