Details
-
Bug
-
Status: Closed
-
High
-
Resolution: Fixed
-
None
-
None
-
Tiger Sprint 197
Description
Reproduction
- Create a project 'A' ( Project is a project from the 'Projects Feature' )
- Open a channel and make sure 'Core' is selected
- Change the page size for the list of events from 10 to 2
- Change to project 'A'
Current situation
- The site changes correctly ( the number of events changes ), but the value of the field does not.
Desired Situation
- The component panel closes. If panel has unsaved changes a dialog is shown to cancel, discard or save the changes
Attachments
Issue Links
- relates to
-
CMS-12700 Close create content step 1 when switching projects
- Open